Provide high quality drinking water, sufficient reserve capacity for fire protection needs, and quality wastewater collection and treatment in the most cost effective, customer friendly manner as possible.
· Employees including Water & Sewer Superintendent – 6
Total combined experience 79 years, average years of experience is 13
· 4 – 140’ wells (500 gpm each)
· 1,520 metered accounts
· 67 Sewer only accounts
· 20.4 miles of Water mains, 302 fire hydrants, 220 water main valves
· 20.8 miles of Sanitary Sewers, 453 manholes
· 2 Water Treatment Iron Removal Facilities (1.25 mgd)
· 1 – 1.25MGD Wastewater Treatment Facility, 3 Sanitary Sewer Pumping Stations
· 1 – 500,000 gallon Elevated Storage Tank
· L.B.I.P. Industrial Effluent Discharge Monitoring
· 172,502,000 Gallons Drinking Water Pumped
· 343,920,000 Gallons Wastewater Treated
· Buildings maintained - 6
Operator, Inspections, Maintenance, Repair
2 Water Plants, with iron removal: EPA Compliance, Sampling and Reporting
4 Wells
Distribution System: Hydrants, Valves, Mains, and Water Meters
Elevated Storage Tank
Meter Reading
Operator, Inspections, Maintenance, Repair
Treatment Plant: Pre-treatment Monitoring
3 Pump Stations
Collection System: Manholes, Mains
Lake Barrington Industrial Park – 1 – 500K Elevated Storage Tank, 1 Water Treatment Iron Removal Facility, 2 Wastewater Pump stations, 1 meter station, meter reading and billing. 4 miles of water and sewer mains. 47 fire hydrants, 32 water main valves, 78 metered accounts to date.
BFI/Dahm Leacheate Acceptance Agreement
Purchase, Maintenance, Repair
Maintenance, Repair
Attend all Public Works Committee meetings.